OVERVIEW

ACWA Power and the Ministry of Energy in Uzbekistan signed a 25-year Power Purchase Agreement (PPA) with a total investment value of US$1.2 billion for the development/construction/operation of a 1500 MW Combined Cycle Gas-Turbine (CCGT) power plant. JSC National Electric Grids of Uzbekistan acts as the sole off-taker.

 

The project will be located in Shirin City in the Sirdarya region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in constructing, engineering, operating and maintaining the plant.

 

The CCGT plant’s efficiency rate will be in excess of 60% - saving almost twice the natural gas currently used for electricity production.

 

KEY FACTS

  • LOCATION
    Shirin City, Sirdarya region, Uzbekistan
  • OFFTAKER
    JSC National Electric Grids of Uzbekistan
  • POWER
    1500 MW
  • PROJECT COST
    USD 1,200 Mn
  • ACWA POWER SHARE
    100%
  • CONFIGURATION
    Combined Cycle Gas-Turbine (CCGT)
  • OFFTAKE CONTRACT
    PPA-BOOT-25 YR
  • PROJECT COMPANY
    ACWA Power Sirdarya LLC