AL DUR PHASE II IWPP

OVERVIEW

Al Dur2 IWPP is an Independent Water and Power Project located at Al Dur in the Kingdom of Bahrain. The Plant shall be developed to generate 1,500 MW of Power based on Combined Cycle Gas Turbine(CCGT) technology and produce 50 MIGD of water through Sea Water Reverse Osmosis (SWRO) technology. The plant shall be integrated with the existing Intake and Outfall facilities while the Gas Connection Facilities shall be developed and transferred to Tatweer to facilitate supply of Natural Gas to the Plant. The Plant is expected to be fully operational by Q2 2022.

 

Click below for:

KEY FACTS

  • LOCATION
    Al Dur, Bahrain
  • OFFTAKER
    Electricity and Water Authority, Bahrain (EWA)
  • POWER
    1,500 MW
  • DESALINATED WATER (000' m3/day)
    227 m3/day
  • FUEL
    Natural Gas
  • PROJECT COST
    USD 1,100 Mn
  • ACWA POWER SHARE
    60%
  • OFFTAKE CONTRACT
    PWPA-BOO 20 years
  • OTHER INVESTORS
    Mitsui (30%), Almoayyed Contracting Group WLL (10%)
  • EPC
    Consortium of SEPCO III, Power China & Sidem
  • O&M
    NOMAC
  • COD
    Q2 2022
  • PROJECT COMPANY
    Haya Power & Desalination Company BSC