The Shuaibah Expansion Project was delivered in response to the Saudi Government’s need for a fast-track solution. The challenge was to provide an additional 150 m3/day of desalinated water to meet the accelerating demand in Jeddah. The project is located on reclaimed land adjacent to the Shuaibah IWPP and both plants use a common water discharge channel. The facility uses reverse osmosis technology with 2 passes (seawater and brine) and energy recovery equipment and systems.
KEY FACTS
LOCATION
120 km south of Jeddah, Western Saudi Arabia
OFFTAKER
Water & Electricity Company
DESALINATED WATER (000' m3/day)
150 m3/day, SWRO
DESALINATION PROCESS
Reverse Osmosis (RO)
PROJECT COST
USD 233 Mn
COMMERCIAL OPERATIONAL DATE
Q4 2009
ACWA POWER SHARE
30.0%
OFFTAKE CONTRACT
WPA-BOO 20 years
O&M
ALIMTIAZ | NOMAC
OTHER INVESTORS
PIF, SEC, Khazanah, TNB, Malakoff
EPC
Siemens Aktiengesellschaft and Doosan Heavy Industries Construction